Urban demolition is about control. You need to keep the work zone separated, protect the street side, and stay flexible as the demolition front moves. On a project in Düsseldorf (Germany), contractor Laarakkers installed a vertical containment curtain along the building line using Robusta’s Jumbo Mast.
The key choice: Jumbo Mast (4.5kg/m2) instead of Heavy Trackway (15kg/m2), to reduce handling effort and bring total deployment costs down.
The site required a practical screening solution that could be installed along the street frontage and adjusted as work progressed, without turning the curtain itself into a major logistical task. What was needed
Heavy Trackway is a known solution, but for this project it would have meant a heavier setup and more handling. Laarakkers wanted a solution that stays efficient in day-to-day execution on a busy, space-constrained site. No crane had to be rented, Laarakkers could use their own Telehandler, saving serious cost.
Laarakkers deployed the Jumbo Mast as the supporting structure for the demolition curtain. The result is a clear, controlled separation between demolition activity and public space. Practical benefits on site.
This setup is especially relevant when you need screening in: